Inscription
Lock and Dam 10, completed in 1915, was part of a slack-water navigation system built for the Ohio River. The site included a brick powerhouse and two lockkeeper houses. The lock and dam was replaced when Pike Island Dam was completed in 1965. The buildings were demolished in 1975. Remnants include two sets of steps, a 600-foot ramp, the lock esplanade and wall, and a recess at the east end where the lock gate once retracted. The first part of this system was the Davis Island Dam near Pittsburgh, completed in 1885. By 1929, a nine-foot pool had been completed along the entire length of the Ohio, culminating with Lock and Dam 53 at Grand Chain, Illinois. Built by the Pittsburgh District of the U. S. Army Corps of Engineers, this system resulted in a more navigable Ohio River with increased depth and diminished current.
[Side B]: Same
Location
Sources
More markers in Jefferson
Ohio Valley Steelworker Statue
Steubenville, OH
The Ohio Valley Steelworker Statue was cast at Centre Foundry and Machine Company in Wheeling, West Virginia and dedicated in 1989.
Mooretown Soldiers Monument
In 1871 Robert and Martha McLaughlin George erected a Soldiers Monument in the memory of their son Thomas and other soldiers from Ross...
William Pittenger Congressional Medal of Honor, 1863
The General at Union Station in Chattanooga, Tennessee (circa 1907).
Society of Friends in Early Smithfield
The Plymouth Meeting of Smithfield is considered one of the earliest Society of Friends (Quaker) congregations in Ohio.
Andrew Carnegie (1835-1919) / Carnegie Library of Steubenville
Steubenville, OH
Andrew Carnegie was born in Dunfermline, Scotland.
